Changes in version 1.3.0 (2009.04.14) ---------------------------------------- * New features / improvements: - A new Settings menu item is added for global configurations - Network traffic generated by Repast based visualization applets is optimized - A stress test documentation is created - The number of running simulations / applets can be limited globally or per model / simulation bases. - Database initialization scheme has changed. In earlier versions it based on a file existance. Now it checks the state of database in terms of existence and emptiness. - Grouped visualization is added. Now in one applet it is possible to view one or more visualizations in tabular tabbed or mixed layout. - Possibility to slow down Repast based simulations. This can be done by setting the "Sleep between steps" model property. - A little performance improvement by optimizing the uses of indexes on data schema. - The state of visualization charts based on Repast or MEME/Fables can be exported to file. - Existing Repast based simulations are deleted at Tomcat start only if their tick count is greater then certain value set up on the Settings page. - New versioning policy is introduced. - The first number indicates mayor releases with mayor changes. - The second indicates that a bunch of new feature has been added. - The third value means a maintenance or bugfix release. * Fixed bugs: - Connection to a simulation was slow if about 10+ user had already been connected - Existing MAC based simulations are unusable after Tomcat restart. - Database initialization script is not MySQL compatible. Changes in version 1.2 (2008.09.10) ---------------------------------------- * New features / improvements: - Repast based models can be uploaded through the web interface. - To install a Repast based model family, instrumentation of model and agent classes is not required. This is done at upload time seamlessly. - Added support for new chart types used by Fables.